Here's what's happening this week on the Madison-Milton bridge project:

• Crews continue placing deck forms and rebar on the new truss in preparation for the first concrete deck pour which is expected in the coming weeks.

• Work is progressing on the transition spans on both sides of the river.

• For the third consecutive year, falcons have produced eggs in the nesting box on the bridge. The eggs are expected to hatch sometime in mid-April. 

• Work continues on detailing the barge impact frames at pier three as workers keep an eye on rising river levels.

• Scour protection work continues at pier 4. (Scour is caused by swiftly moving water past the piers and can cause erosion.)

• Crews continue installing an inspection access walkway on the new truss.

- Source: Bridge Project Team