A piece of heavy machinery cuts through the truss portion of the span of the Madison-Milton Bridge that was taken down Tuesday. The river was scheduled to be closed to traffic for 24 hours as the crews moved the wreckage to the Milton side of the river. The bridge will be dismantled and sold for scrap. (Staff photo by Ken Ritchie/kritchie@madisoncourier.com)